Monthly trade publication
Onsite Installer
Septic design, installation and repair, with coverage of treatment units, dispersal, pumps, controls and field practice.
Frequently asked questions
Start here for the questions that come up most often. For advice about a particular property, speak with Mike.
Publications & ROWP verificationThe right budget depends on the site, expected use, treatment requirements, field layout, access and excavation. Remote transport can be a significant part of an island project. A site visit is the starting point for a useful estimate; we explain the proposed scope before you commit to construction.
Timing depends on site investigation, design, filing, equipment availability and the construction schedule. In BC, an authorized person files system information with the health authority before construction; this is not a conventional permit approval process for an ordinary septic system. We discuss the steps and a realistic schedule for your particular project.
We talk about your building plans, occupancy and future uses, then review access, existing system information and possible field locations. Test pits and soil assessment help establish what the ground can support. Bring any existing septic records, survey or building plans you have.
Type 1 uses a septic tank and dispersal field. Type 2 adds treatment to achieve a higher effluent quality. Type 3 achieves a further defined treatment standard and requires professional involvement. Treatment type and field layout are selected for the property, rather than chosen from a one-size-fits-all package.
BC’s Sewerage System Regulation requires an authorized person for Type 1 and 2 construction and maintenance, or an owner working under their supervision. Type 3 work requires supervision by a qualified professional. Mike is a Registered Onsite Wastewater Practitioner; engineering is coordinated where the project requires it.
Follow the maintenance plan supplied for your system and keep service records. The interval depends on treatment equipment, pumps, usage and site conditions. Tank pumping and system servicing are different tasks. We can review the records and help identify the appropriate next service.
Yes. Our project photos include island excavation, barge access, tank placement and bulk material handling. Tell us about the landing, access route, slopes and site restrictions early so logistics can be considered alongside the system itself.
A change in occupancy or building use can change the wastewater design requirements. The existing system should be assessed before you rely on it for a renovation, suite or additional dwelling. We review the records and site to work out the next step.
It can reduce the required infiltrative area when the site supports a higher hydraulic loading rate. Minimum contour length is a separate consideration, so the field may become narrower without becoming shorter. See our Type 1, 2 and 3 explanation for a worked example.
Sometimes a component can be repaired or replaced; other situations call for a new dispersal field or system. An assessment helps separate pump, control, pipe, tank and field problems before a scope is chosen. Contact us if you see backups, persistent odours or unexpected wet areas.
BC onsite sewage system management and the Sewerage System Regulation explain treatment classifications, authorized persons and owner responsibilities.
Septic resources
Trade publications for design, installation and maintenance, plus BC association and registration resources.
ASTTBC · Public registrant directory
Check a practitioner’s current registration status and endorsements in ASTTBC’s public directory.
Mike Crawford · ROWP OW0980
Start with the surname Crawford, then open the matching name to review the registrant’s details.
About ROWP roles & registration (opens in a new tab)Monthly trade publication
Septic design, installation and repair, with coverage of treatment units, dispersal, pumps, controls and field practice.
Monthly trade publication
Practical reading on septic servicing, pumping, maintenance, equipment and the day-to-day work of liquid waste professionals.
BC industry association
Training, continuing education and industry news for the onsite wastewater community in British Columbia.
Start with a conversation